Tuesday, March 8, 2011

Rockwalls

Met with Metro Mix Concrete at job site this morning at 8:00 to pour rock wall footings.  However it was determined that there was too much risk of truck overturning while pouring.  Consequently have scheduled a concrete pump for tomorrow.  Pour now set for tomorrow at 10:00 am for rear and west side footings.

Met with Jeff Huff this morning at 8:30 to discuss:
1.  East side rock wall to become retaining instead of garden wall.  Conde did not consider the green space  that we cannot disturb.
2.  Raising the finished floor of the home from 4490 - 4491 to allow for better water run off from driveway. 
3.  Secondary parking options: Jeff planning to run some ideas by Larry.  No change at this point until approval by Larry.


Northwest Rock Wall Footings


North Rock Wall Footings


West Rock Wall Footings
Construction Ramp for Pump Truck


No comments:

Post a Comment