Tuesday, November 22, 2011

Trellis and Rear Porch Tile

Trellis from underneath porch


Trellis from on roof


Floating rear porch for tile


Floating rear porch for tile

Cabinets scheduled for install 11/29/11

Monday, October 24, 2011

Sheetrock and Starting to Paint

Using Lights to check for defects in Sheetrock

Starting to Paint

Tuesday, October 11, 2011

Foam Detail Installation

Starting the foam detail installation

Foam detail

Foam detail with stucco coat

Entry doors

Entry transom windows

Monday, September 19, 2011

Stucco

Started Stucco Brown 09/19/2011


East Wall Brown Completed

Friday, September 16, 2011

Sound Insulation and Sheetrock

Master bedroom sound insulation


Sound Insulation


Office


Sheetrock


Hard to see.  But 15 Sheetrock workers


Master bedroom

Thursday, September 8, 2011

Insulation

Insulation Contractor

Start of Insulation



Insulation Installation

Monday, September 5, 2011

Fireplace and Sunset

Fireplace box

Chimney

Roof

Sunset

Sunset

Unstained interior door

Stucco Wrap and Windows


First window installed

Tyvek and windows

Rear patio windows

Family room windows

Office windows

Start of felt over Tyvek

Master bathroom windows

Master bedroom windows

Tuesday, August 9, 2011

Roofing Continued

Three-Ply Fiberglass


Cant Strip and Base Flashing


Three-Ply Fiberglass and Cant Strip


Base Sheet and Cant Strip

Stucco and Roofing

Starting to Wrap Home in Tyvek.

Tar and kettle to start roofing.

Thursday, July 14, 2011

Roofing

Starting to install base sheet

Installing base sheet

Installing base sheet

Saturday, July 9, 2011

Back Porch Framing

Rear Porch

Rear Porch

Rear Porch

Rear Porch

Friday, July 1, 2011

Framing Continues

Steel Columns Set

Steel Columns

Office Roof