Stockton Residence
Tuesday, November 22, 2011
Trellis and Rear Porch Tile
Trellis from underneath porch
Trellis from on roof
Floating rear porch for tile
Floating rear porch for tile
Cabinets scheduled for install 11/29/11
Monday, October 24, 2011
Sheetrock and Starting to Paint
Using Lights to check for defects in Sheetrock
Starting to Paint
Tuesday, October 11, 2011
Foam Detail Installation
Starting the foam detail installation
Foam detail
Foam detail with stucco coat
Entry doors
Entry transom windows
Monday, September 19, 2011
Stucco
Started Stucco Brown 09/19/2011
East Wall Brown Completed
Friday, September 16, 2011
Sound Insulation and Sheetrock
Master bedroom sound insulation
Sound Insulation
Office
Sheetrock
Hard to see. But 15 Sheetrock workers
Master bedroom
Thursday, September 8, 2011
Insulation
Insulation Contractor
Start of Insulation
Insulation Installation
Monday, September 5, 2011
Fireplace and Sunset
Fireplace box
Chimney
Roof
Sunset
Sunset
Unstained interior door
Stucco Wrap and Windows
First window installed
Tyvek and windows
Rear patio windows
Family room windows
Office windows
Start of felt over Tyvek
Master bathroom windows
Master bedroom windows
Tuesday, August 9, 2011
Roofing Continued
Three-Ply Fiberglass
Cant Strip and Base Flashing
Three-Ply Fiberglass and Cant Strip
Base Sheet and Cant Strip
Stucco and Roofing
Starting to Wrap Home in Tyvek.
Tar and kettle to start roofing.
Thursday, July 14, 2011
Roofing
Starting to install base sheet
Installing base sheet
Installing base sheet
Saturday, July 9, 2011
Back Porch Framing
Rear Porch
Rear Porch
Rear Porch
Rear Porch
Friday, July 1, 2011
Framing Continues
Steel Columns Set
Steel Columns
Office Roof